quanfu quanfu

Product Center

/
/
/
The No. 2 plant of the vaccine industrialization project was successfully started

The No. 2 plant of the vaccine industrialization project was successfully started

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2022-05-24
  • Views:

(Summary description)At the beginning of Jingyu, the air is refreshing, and the jade waves are rippling and the bridge is flat. On the green and vibrant Nanguan River, colorful flags fluttered and people were surging. With the sound of firecrackers, the No. 2 plant of the vaccine industrialization project of Ab&B Bio-Tech CO.,LTD.JS. started construction!

The No. 2 plant of the vaccine industrialization project was successfully started

(Summary description)At the beginning of Jingyu, the air is refreshing, and the jade waves are rippling and the bridge is flat. On the green and vibrant Nanguan River, colorful flags fluttered and people were surging. With the sound of firecrackers, the No. 2 plant of the vaccine industrialization project of Ab&B Bio-Tech CO.,LTD.JS. started construction!

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2022-05-24 16:07
  • Views:
Information
At the beginning of Jingyu, the air is refreshing, and the jade waves are rippling and the bridge is flat. On the green and vibrant Nanguan River, colorful flags fluttered and people were surging. With the sound of firecrackers, the No. 2 plant of the vaccine industrialization project of Ab&B Bio-Tech CO.,LTD.JS. started construction!
All employees of Ab&B Bio-Tech CO.,LTD.JS, representatives of the construction side of Jiangsu Meikai Construction Engineering Co., Ltd., Jiangsu Wanshun Installation Engineering Co., Ltd., and representatives of the supervision side of Jiangsu Yiyuan Engineering Consulting Co., Ltd. attended the groundbreaking ceremony.
In his speech, Mr. An briefly summarized the five-year development process of the company taking root in fertile soil, growing vigorously, gaining wings, and achieving remarkable achievements, and expressed his ardent expectations for the quality, quantity, and completion of the project construction goals on schedule and the upcoming project construction. Sincere greetings from the hardworking comrades. At the same time, a clear request was made to us: to seize the day and move forward with great strides!
As the representative of the construction unit, Mr. Chen Kangzhen, general manager of Jiangsu Meikai Construction Engineering Co., Ltd., made a commitment to complete the project construction with safety first and first-class quality; he proposed that both parties should always keep in mind the process of project construction, keep working hard, cooperate closely, and jointly create The requirements for good achievements; expressing the best wishes for the good and rapid development of Ab&B Bio-Tech CO.,LTD.JS.
A single thread cannot make a thread, and a single tree cannot make a forest. In the closing year of the 1st Five-Year Plan, we will walk with one heart, seize the day and the night, stride forward, and start the new journey of the 2nd Five-Year Plan with a perfect attitude!
 
pic
Scan the QR code to read on your phone

Relevant information

Have a project?Get a touch!

Caring for life, protecting health, and making global technological innovation vaccines are the mission of Ab&B Bio

Contact

E-mail:info@abbbio.com.cn
Add:No. 32, Xinglin Road, Medical High-tech Zone, Taizhou City

Copyright © 2022 Ab&B Bio-Tech CO.,LTD.JS All Rights Reserved.   Powered by:www.300.cn
Search